A high-recovery treatment train converts saline wastewater into reusable process water.

Chemical plant wastewater treatment and ZLD water reuse equipment

Application and project challenge

High-salinity chemical wastewater creates discharge and water recovery challenges. The membrane treatment train targets fouling control, process water reuse and reduced discharge as part of a ZLD strategy.

Technical project reference

Design capacity: 100 m³/h. The documented membrane train supports water recovery; final concentrate treatment and project-specific discharge specifications are available on request.

Process
UF + two-stage RO + EDI
Goal
ZLD and water recovery
Application
High-salinity chemical wastewater
Advantage
Anti-fouling, low operating cost
Benefit
Less discharge, resource recovery