Heilongjiang, China
Magnesium Plant ZLD System
Capacity: 100 m³/h
A high-recovery treatment train converts saline wastewater into reusable process water.

Application and project challenge
High-salinity chemical wastewater creates discharge and water recovery challenges. The membrane treatment train targets fouling control, process water reuse and reduced discharge as part of a ZLD strategy.
Technical project reference
Design capacity: 100 m³/h. The documented membrane train supports water recovery; final concentrate treatment and project-specific discharge specifications are available on request.
- Process
- UF + two-stage RO + EDI
- Goal
- ZLD and water recovery
- Application
- High-salinity chemical wastewater
- Advantage
- Anti-fouling, low operating cost
- Benefit
- Less discharge, resource recovery